These 3m diameter pipes were joined together to form a large retention tank. Ends were poured two of the pipes and a manhole was put in the side of one. The rest were sealed together to create an 80,000 litre retention tank.
Shown here is driver Dave working “the old girl” our T line and Fassi 53000 crane placing the pipes together.